In phase 2 of the Flower Direct project we renovated a wide-span greenhouse by replacing the aluminum glass roof system with a sandwich roof. We used 50-80 mm sandwich panels for this. In addition, the facades have also been replaced with sandwich facade panels.
In phase 1 of this project we built a new business space at the rear of the building. Click here to view this project.
Project.
Flower Direct - Phase 2 - 8.354 m²
Project details.
- Area
- 8.354 m²
- Location
- Aalsmeer, The Netherlands
- Delivered
- Renovation,
- Project status
- Delivered
- Completion
- August, 2023